Award
89303924FEM400054
View source record on USAspending.gov ↗HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THIS TASK ORDER IS ISSUED AS AN UNDEFINITIZED TASK ORDER PURSUANT TO CLAUSE H.49, TASK ORDERING PROCEDURE. NOTICE-TO-PROCEED AND A NOT-TO-EXCEED VALUE OF $98,000,000
- Recipient
- CENTRAL PLATEAU CLEANUP COMPANY, LLC
- Awarding agency
- Department of Energy
- Sub-agency
- Department of Energy
- Fiscal year
- FY2024
- Obligated (promised)
- $945,862,222
- Total obligation (detail)
- $945,862,222
- Potential value (ceiling)
- $1,619,017,225
- Outlaid (paid out, linked File C)
- no linked financial data
- Signed
- Sep 16, 2024
- Period of performance
- Oct 1, 2024 – Sep 30, 2027
- Competition
- FULL AND OPEN COMPETITION
- Offers received
- —
- Solicitation
- NEGOTIATED PROPOSAL/QUOTE
- Pricing
- COST PLUS AWARD FEE
- NAICS
- 562910 — REMEDIATION SERVICES
- Award type
- DELIVERY ORDER
Transactions (53)
| 0 | Sep 16, 2024 | — | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THIS TASK ORDER IS ISSUED AS AN UNDEFINITIZED TASK ORDER PURSUANT TO CLAUSE H.49, TASK ORDERING PROCEDURE. NOTICE-TO-PROCEED AND A NOT-TO-EXCEED VALUE OF $98,000,000 |
| P00001 | Sep 27, 2024 | FUNDING ONLY ACTION | $36,592,449 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $36,592,448.69 IN INCREMENTAL FUNDING (REQ 24EM002317) FOR UNINTERRUPTED SUPPORT THROUGH 10/17/2024, FOR THE CENTRAL PL |
| P00002 | Oct 7, 2024 | OTHER ADMINISTRATIVE ACTION | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE TASK ORDER 7 SECTION C, TO REMOVE REFERENCE TO RL AND/OR ORP, AND REPLACE WITH HANFORD FIELD OFFICE (HFO). |
| P00003 | Oct 21, 2024 | FUNDING ONLY ACTION | $45,221,900 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $45,221,900.00 IN INCREMENTAL FUNDING (REQ 25EM000067) FOR UNINTERRUPTED SUPPORT THROUGH 11/24/2024. |
| P00004 | Nov 25, 2024 | FUNDING ONLY ACTION | $16,185,651 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $16,185,651.31 IN INCREMENTAL FUNDING (REQ 25EM000268) FOR UNINTERRUPTED SUPPORT THROUGH DECEMBER 2024. |
| P00005 | Dec 19, 2024 | FUNDING ONLY ACTION | $47,884,315 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $47,884,315.31 IN INCREMENTAL FUNDING (REQ 25EM000432) FOR UNINTERRUPTED SUPPORT THROUGH JANUARY 22, 2025, FOR CENTRAL |
| P00006 | Jan 2, 2025 | CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A NOT-TO-EXCEED (NTE) INCREASE OF $102.9M REVISING THE NTE VALUE FROM $98M TO $200.9M. |
| P00009 | Jan 27, 2025 | FUNDING ONLY ACTION | $50,552,063 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $50,552,062.91 IN INCREMENTAL FUNDING (REQ 25EM000565) FOR UNINTERRUPTED SUPPORT THROUGH FEBRUARY 27, 2025. |
| P00007 | Feb 12, 2025 | CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE A NTE TO CPCCO IN THE AMOUNT OF $10.9M FOR CARRYOVER SCOPE FROM TO-04 THAT WILL BE COMPLETED WITHIN TO-07. |
| P00008 | Feb 12, 2025 | CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A NTE VALUE OF $14.2M FOR THE TO-07 ADDITIONAL SCOPE OF WORK PROVIDED IN RFP LETTER 24-AMRP-0025, DATED SEPTEMBER 24, |
| P00010 | Feb 24, 2025 | FUNDING ONLY ACTION | $61,580,913 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $61,580,912.62 IN INCREMENTAL FUNDING (REQ 25EM000733) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH APRIL 20, |
| P00011 | Apr 8, 2025 | OTHER ADMINISTRATIVE ACTION | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE INVOICE APPROVING OFFICIAL FROM KELLY A. BRAZIL TO BRENDA S. VALADEZ. |
| P00013 | Apr 28, 2025 | CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE AN NTE INCREASE IN THE AMOUNT OF $4.9M FOR CARRYOVER SCOPE FROM TO-04 THAT WILL BE COMPLETED WITHIN TO-07. |
| P00012 | Apr 29, 2025 | FUNDING ONLY ACTION | $39,081,103 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $39,081,102.87 IN INCREMENTAL FUNDING (REQ 25EM001089) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH MAY 22, 20 |
| P00014 | Apr 29, 2025 | DEFINITIZE CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE TO 07, END STATES AND BASE OPERATIONS. THIS MODIFICATION ALSO UPDATES SECTION C, PERFORMANCE WORK STATEMENT. |
| P00015 | May 12, 2025 | FUNDING ONLY ACTION | $52,770,040 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $52,770,040.00 IN INCREMENTAL FUNDING (REQ 25EM001228) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH JUNE 22, 2 |
| P00017 | May 27, 2025 | CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE FOR CP-25-006 FY 25 ADDITIONAL SCOPE, WRAP MOD, AND 100 AREA SCOPE REALIGNMENT. |
| P00016 | Jun 4, 2025 | DEFINITIZE CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CP-07-001, ADDITIONAL 100K AREA D4 SCOPE FOR FY26. |
| P00019 | Jun 9, 2025 | FUNDING ONLY ACTION | $68,286,840 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $68,286,840.00 IN INCREMENTAL FUNDING (REQ 25EM001356) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH JULY 31, 2 |
| P00018 | Jun 12, 2025 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION C, PERFORMANCE WORK STATEMENT. |
| P00020 | Jun 30, 2025 | FUNDING ONLY ACTION | $12,208,902 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE VALUE AND FUNDING IN THE AMOUNT OF $12,208,901.59 FOR THE PERSONAL TIME BANK (PTB) AND SICK LEAVE LIABILITY SCOPE. |
| P00022 | Jul 16, 2025 | CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE NOT-TO-EXCEED VALUE BY $68,000.00 FROM $457,000.00 (MODIFICATION P00017) TO $525,000.00 FOR THE WRAP PROPOSAL. |
| P00021 | Jul 24, 2025 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ATTACHMENT J-15, PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) FOR FISCAL YEARS 2025, 2026, AND 2027 INTO |
| P00023 | Aug 4, 2025 | FUNDING ONLY ACTION | $62,099,689 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $62,099,689.44 IN INCREMENTAL FUNDING (REQ 25EM001685) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH SEPTEMBER |
| P00025 | Aug 28, 2025 | FUNDING ONLY ACTION | $78,365 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $78,364.52 IN BONNEVILLE POWER ADMINISTRATION (BPA) REBATES (REQ 25EM001890). |
| P00026 | Sep 10, 2025 | CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE INCREASE FOR CP-24-006 FY25 ADDITIONAL SCOPE, CP-24-008 TO-04 CARRYOVER SCOPE, AND CP-07-002 WRAP PROPOSAL. |
| P00027 | Sep 10, 2025 | FUNDING ONLY ACTION | $57,039,848 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $57,039,847.93 IN INCREMENTAL FUNDING (REQ 25EM001971) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR |
| P00024 | Sep 15, 2025 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION C, PERFORMANCE WORK STATEMENT. |
| P00028 | Sep 29, 2025 | FUNDING ONLY ACTION | $19,498,447 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $19,498,447.17 IN INCREMENTAL FUNDING (REQ 25EM002146) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH NOVEMBER 5 |
| P00029 | Oct 6, 2025 | DEFINITIZE CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CP-24-006, ADDITIONAL TASK ORDER 07 SCOPE OF WORK. |
| P00030 | Oct 7, 2025 | DEFINITIZE CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CP-24-008, CARRYOVER SCOPE OF WORK. |
| P00031 | Oct 21, 2025 | FUNDING ONLY ACTION | $35,000,000 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $35,000,000.00 IN INCREMENTAL FUNDING (REQ 26EM000027) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR |
| P00032 | Nov 3, 2025 | FUNDING ONLY ACTION | $600,000 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $600,000.00 IN INCREMENTAL FUNDING (REQ 26EM000076). UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR REMAI |
| P00033 | Nov 12, 2025 | CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE CHWP ALTERNATIVE/TRUPACT SCOPE REPLANNING. |
| P00034 | Dec 1, 2025 | CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE CHANGE ORDER ADDRESSING 100 AREA REALIGNMENT WITH ADDED AND DELETED TASK ORDER 07 SCOPE, AND UPDATE TASK ORD |
| P00035 | Dec 4, 2025 | FUNDING ONLY ACTION | $102,594,618 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $102,594,617.55 IN INCREMENTAL FUNDING (REQ 26EM000228) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDO |
| P00036 | Dec 23, 2025 | FUNDING ONLY ACTION | $58,449,748 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $58,449,748.03 IN INCREMENTAL FUNDING (REQ 26EM000388) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR |
| P00037 | Jan 29, 2026 | FUNDING ONLY ACTION | $7,000,000 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $7,000,000.00 IN INCREMENTAL FUNDING (REQ 26EM000515) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR |
| P00038 | Feb 10, 2026 | CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE FOR 216-Z-1A CONTAMINATION CLEANUP DIFFERING SITE CONDITION. |
| P00039 | Feb 26, 2026 | DEFINITIZE CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CP-07-002 SOIL AND GROUNDWATER AND RISK REDUCTION SCOPE REALIGNMENT. |
| P00041 | Mar 12, 2026 | FUNDING ONLY ACTION | $47,858,109 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $47,858,109.31 IN INCREMENTAL FUNDING (REQ 26EM000777) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH MAY 14, 20 |
| P00042 | Apr 2, 2026 | FUNDING ONLY ACTION | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $64,001.79 IN RFS GENERAL MATTER FUNDING (REQ 26EM000960). |
| P00045 | Apr 23, 2026 | FUNDING ONLY ACTION | $158,720,520 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $158,720,520.00 IN INCREMENTAL FUNDING (REQ 26EM001077) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDO |
| P00044 | Apr 27, 2026 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ATTACHMENT J-15, FISCAL YEARS 2025, 2026, AND 2027 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) REVISION |
| P00040 | May 4, 2026 | CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE FOR THE FUEL AND MATERIALS EXAMINATION FACILITY (FMEF), 100K ADDITIONAL SCOPE, RL-13 PLUS-UP & 216-Z-1A DI |
| P00046 | May 5, 2026 | FUNDING ONLY ACTION | $1,550,000 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $1,550,000.00 IN INCREMENTAL FUNDING (REQ 26EM001177). UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR REM |
| P00047 | May 8, 2026 | FUNDING ONLY ACTION | -$15,120,640 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE $15,120,640.00 IN INCREMENTAL FUNDING FROM TO-07, END STATES AND BASE OPERATIONS TO MOVE BACK TO TO-06, MANHATTA |
| P00048 | May 11, 2026 | FUNDING ONLY ACTION | -$19,879,360 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE $19,879,360.00 IN INCREMENTAL FUNDING FROM TO-07, END STATES AND BASE OPERATIONS TO MOVE BACK TO TO-06, MANHATTA |
| P00049 | Jun 11, 2026 | CHANGE ORDER | $8,703 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE INCREASE FOR THE FUEL AND MATERIALS EXAMINATION FACILITY (FMEF) GENERAL MATTER (GEM) SCOPE OF WORK. IT ALSO PR |
| P00043 | Jun 28, 2026 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION C, PERFORMANCE WORK STATEMENT. |
| P00051 | Jun 30, 2026 | CHANGE ORDER | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE FOR THE RL-30 ADDITIONAL SCOPE. |
| P00050 | Jul 1, 2026 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ATTACHMENT J-15, FISCAL YEARS 2025, 2026, AND 2027 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) REVISION |
| P00053 | Jul 29, 2026 | OTHER ADMINISTRATIVE ACTION | $0 | HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE PROGRAM OFFICIAL FROM HEATHER DALE TO SCOTT GREEN. |
Record history in our archive
Outlay keeps a content-hashed copy of this record from every pull. No post-publication revisions observed so far.