HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THIS TASK ORDER IS ISSUED AS AN UNDEFINITIZED TASK ORDER PURSUANT TO CLAUSE H.49, TASK ORDERING PROCEDURE. NOTICE-TO-PROCEED AND A NOT-TO-EXCEED VALUE OF $98,000,000

Recipient
CENTRAL PLATEAU CLEANUP COMPANY, LLC
Awarding agency
Department of Energy
Sub-agency
Department of Energy
Fiscal year
FY2024
Obligated (promised)
$945,862,222
Total obligation (detail)
$945,862,222
Potential value (ceiling)
$1,619,017,225
Outlaid (paid out, linked File C)
no linked financial data
Signed
Sep 16, 2024
Period of performance
Oct 1, 2024 – Sep 30, 2027
Competition
FULL AND OPEN COMPETITION
Offers received
Solicitation
NEGOTIATED PROPOSAL/QUOTE
Pricing
COST PLUS AWARD FEE
NAICS
562910 — REMEDIATION SERVICES
Award type
DELIVERY ORDER

Transactions (53)

0Sep 16, 2024$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THIS TASK ORDER IS ISSUED AS AN UNDEFINITIZED TASK ORDER PURSUANT TO CLAUSE H.49, TASK ORDERING PROCEDURE. NOTICE-TO-PROCEED AND A NOT-TO-EXCEED VALUE OF $98,000,000
P00001Sep 27, 2024FUNDING ONLY ACTION$36,592,449HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $36,592,448.69 IN INCREMENTAL FUNDING (REQ 24EM002317) FOR UNINTERRUPTED SUPPORT THROUGH 10/17/2024, FOR THE CENTRAL PL
P00002Oct 7, 2024OTHER ADMINISTRATIVE ACTION$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE TASK ORDER 7 SECTION C, TO REMOVE REFERENCE TO RL AND/OR ORP, AND REPLACE WITH HANFORD FIELD OFFICE (HFO).
P00003Oct 21, 2024FUNDING ONLY ACTION$45,221,900HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $45,221,900.00 IN INCREMENTAL FUNDING (REQ 25EM000067) FOR UNINTERRUPTED SUPPORT THROUGH 11/24/2024.
P00004Nov 25, 2024FUNDING ONLY ACTION$16,185,651HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $16,185,651.31 IN INCREMENTAL FUNDING (REQ 25EM000268) FOR UNINTERRUPTED SUPPORT THROUGH DECEMBER 2024.
P00005Dec 19, 2024FUNDING ONLY ACTION$47,884,315HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $47,884,315.31 IN INCREMENTAL FUNDING (REQ 25EM000432) FOR UNINTERRUPTED SUPPORT THROUGH JANUARY 22, 2025, FOR CENTRAL
P00006Jan 2, 2025CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A NOT-TO-EXCEED (NTE) INCREASE OF $102.9M REVISING THE NTE VALUE FROM $98M TO $200.9M.
P00009Jan 27, 2025FUNDING ONLY ACTION$50,552,063HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $50,552,062.91 IN INCREMENTAL FUNDING (REQ 25EM000565) FOR UNINTERRUPTED SUPPORT THROUGH FEBRUARY 27, 2025.
P00007Feb 12, 2025CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE A NTE TO CPCCO IN THE AMOUNT OF $10.9M FOR CARRYOVER SCOPE FROM TO-04 THAT WILL BE COMPLETED WITHIN TO-07.
P00008Feb 12, 2025CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A NTE VALUE OF $14.2M FOR THE TO-07 ADDITIONAL SCOPE OF WORK PROVIDED IN RFP LETTER 24-AMRP-0025, DATED SEPTEMBER 24,
P00010Feb 24, 2025FUNDING ONLY ACTION$61,580,913HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $61,580,912.62 IN INCREMENTAL FUNDING (REQ 25EM000733) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH APRIL 20,
P00011Apr 8, 2025OTHER ADMINISTRATIVE ACTION$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE INVOICE APPROVING OFFICIAL FROM KELLY A. BRAZIL TO BRENDA S. VALADEZ.
P00013Apr 28, 2025CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE AN NTE INCREASE IN THE AMOUNT OF $4.9M FOR CARRYOVER SCOPE FROM TO-04 THAT WILL BE COMPLETED WITHIN TO-07.
P00012Apr 29, 2025FUNDING ONLY ACTION$39,081,103HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $39,081,102.87 IN INCREMENTAL FUNDING (REQ 25EM001089) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH MAY 22, 20
P00014Apr 29, 2025DEFINITIZE CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE TO 07, END STATES AND BASE OPERATIONS. THIS MODIFICATION ALSO UPDATES SECTION C, PERFORMANCE WORK STATEMENT.
P00015May 12, 2025FUNDING ONLY ACTION$52,770,040HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $52,770,040.00 IN INCREMENTAL FUNDING (REQ 25EM001228) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH JUNE 22, 2
P00017May 27, 2025CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE FOR CP-25-006 FY 25 ADDITIONAL SCOPE, WRAP MOD, AND 100 AREA SCOPE REALIGNMENT.
P00016Jun 4, 2025DEFINITIZE CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CP-07-001, ADDITIONAL 100K AREA D4 SCOPE FOR FY26.
P00019Jun 9, 2025FUNDING ONLY ACTION$68,286,840HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $68,286,840.00 IN INCREMENTAL FUNDING (REQ 25EM001356) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH JULY 31, 2
P00018Jun 12, 2025SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION C, PERFORMANCE WORK STATEMENT.
P00020Jun 30, 2025FUNDING ONLY ACTION$12,208,902HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE VALUE AND FUNDING IN THE AMOUNT OF $12,208,901.59 FOR THE PERSONAL TIME BANK (PTB) AND SICK LEAVE LIABILITY SCOPE.
P00022Jul 16, 2025CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE NOT-TO-EXCEED VALUE BY $68,000.00 FROM $457,000.00 (MODIFICATION P00017) TO $525,000.00 FOR THE WRAP PROPOSAL.
P00021Jul 24, 2025SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ATTACHMENT J-15, PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) FOR FISCAL YEARS 2025, 2026, AND 2027 INTO
P00023Aug 4, 2025FUNDING ONLY ACTION$62,099,689HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $62,099,689.44 IN INCREMENTAL FUNDING (REQ 25EM001685) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH SEPTEMBER
P00025Aug 28, 2025FUNDING ONLY ACTION$78,365HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $78,364.52 IN BONNEVILLE POWER ADMINISTRATION (BPA) REBATES (REQ 25EM001890).
P00026Sep 10, 2025CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE INCREASE FOR CP-24-006 FY25 ADDITIONAL SCOPE, CP-24-008 TO-04 CARRYOVER SCOPE, AND CP-07-002 WRAP PROPOSAL.
P00027Sep 10, 2025FUNDING ONLY ACTION$57,039,848HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $57,039,847.93 IN INCREMENTAL FUNDING (REQ 25EM001971) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR
P00024Sep 15, 2025SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION C, PERFORMANCE WORK STATEMENT.
P00028Sep 29, 2025FUNDING ONLY ACTION$19,498,447HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $19,498,447.17 IN INCREMENTAL FUNDING (REQ 25EM002146) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH NOVEMBER 5
P00029Oct 6, 2025DEFINITIZE CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CP-24-006, ADDITIONAL TASK ORDER 07 SCOPE OF WORK.
P00030Oct 7, 2025DEFINITIZE CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CP-24-008, CARRYOVER SCOPE OF WORK.
P00031Oct 21, 2025FUNDING ONLY ACTION$35,000,000HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $35,000,000.00 IN INCREMENTAL FUNDING (REQ 26EM000027) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR
P00032Nov 3, 2025FUNDING ONLY ACTION$600,000HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $600,000.00 IN INCREMENTAL FUNDING (REQ 26EM000076). UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR REMAI
P00033Nov 12, 2025CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE CHWP ALTERNATIVE/TRUPACT SCOPE REPLANNING.
P00034Dec 1, 2025CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE CHANGE ORDER ADDRESSING 100 AREA REALIGNMENT WITH ADDED AND DELETED TASK ORDER 07 SCOPE, AND UPDATE TASK ORD
P00035Dec 4, 2025FUNDING ONLY ACTION$102,594,618HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $102,594,617.55 IN INCREMENTAL FUNDING (REQ 26EM000228) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDO
P00036Dec 23, 2025FUNDING ONLY ACTION$58,449,748HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $58,449,748.03 IN INCREMENTAL FUNDING (REQ 26EM000388) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR
P00037Jan 29, 2026FUNDING ONLY ACTION$7,000,000HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $7,000,000.00 IN INCREMENTAL FUNDING (REQ 26EM000515) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR
P00038Feb 10, 2026CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE FOR 216-Z-1A CONTAMINATION CLEANUP DIFFERING SITE CONDITION.
P00039Feb 26, 2026DEFINITIZE CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE CP-07-002 SOIL AND GROUNDWATER AND RISK REDUCTION SCOPE REALIGNMENT.
P00041Mar 12, 2026FUNDING ONLY ACTION$47,858,109HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $47,858,109.31 IN INCREMENTAL FUNDING (REQ 26EM000777) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU THROUGH MAY 14, 20
P00042Apr 2, 2026FUNDING ONLY ACTION$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $64,001.79 IN RFS GENERAL MATTER FUNDING (REQ 26EM000960).
P00045Apr 23, 2026FUNDING ONLY ACTION$158,720,520HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $158,720,520.00 IN INCREMENTAL FUNDING (REQ 26EM001077) FOR UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDO
P00044Apr 27, 2026SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ATTACHMENT J-15, FISCAL YEARS 2025, 2026, AND 2027 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) REVISION
P00040May 4, 2026CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE FOR THE FUEL AND MATERIALS EXAMINATION FACILITY (FMEF), 100K ADDITIONAL SCOPE, RL-13 PLUS-UP & 216-Z-1A DI
P00046May 5, 2026FUNDING ONLY ACTION$1,550,000HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ADD $1,550,000.00 IN INCREMENTAL FUNDING (REQ 26EM001177). UNINTERRUPTED SUPPORT FOR CENTRAL PLATEAU AND RIVER CORRIDOR REM
P00047May 8, 2026FUNDING ONLY ACTION-$15,120,640HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE $15,120,640.00 IN INCREMENTAL FUNDING FROM TO-07, END STATES AND BASE OPERATIONS TO MOVE BACK TO TO-06, MANHATTA
P00048May 11, 2026FUNDING ONLY ACTION-$19,879,360HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE $19,879,360.00 IN INCREMENTAL FUNDING FROM TO-07, END STATES AND BASE OPERATIONS TO MOVE BACK TO TO-06, MANHATTA
P00049Jun 11, 2026CHANGE ORDER$8,703HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE INCREASE FOR THE FUEL AND MATERIALS EXAMINATION FACILITY (FMEF) GENERAL MATTER (GEM) SCOPE OF WORK. IT ALSO PR
P00043Jun 28, 2026SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION C, PERFORMANCE WORK STATEMENT.
P00051Jun 30, 2026CHANGE ORDER$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN NTE FOR THE RL-30 ADDITIONAL SCOPE.
P00050Jul 1, 2026SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ATTACHMENT J-15, FISCAL YEARS 2025, 2026, AND 2027 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) REVISION
P00053Jul 29, 2026OTHER ADMINISTRATIVE ACTION$0HANFORD CENTRAL PLATEAU CLEANUP CONTRACT - TASK ORDER 7 - END STATES & BASE OPS. THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE PROGRAM OFFICIAL FROM HEATHER DALE TO SCOTT GREEN.