NEW BOILER PLANT AT THE VA MEDICAL CENTER, WEST LOS ANGELES, CA

Recipient
S. J. AMOROSO CONSTRUCTION CO., LLC
Awarding agency
Department of Veterans Affairs
Sub-agency
Department of Veterans Affairs
Fiscal year
FY2025
Obligated (promised)
$69,636,302
Total obligation (detail)
$69,636,302
Potential value (ceiling)
$69,636,302
Outlaid (paid out, linked File C)
no linked financial data
Signed
Feb 27, 2025
Period of performance
Feb 27, 2025 – Apr 21, 2027
Competition
FULL AND OPEN COMPETITION
Offers received
1
Solicitation
NEGOTIATED PROPOSAL/QUOTE
Pricing
FIRM FIXED PRICE
NAICS
236220 — COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION
Award type
DEFINITIVE CONTRACT

Structural flags (1)

  • Competed award, single offer received

    These contracts were officially open for any company to compete, but only one company showed up. Sometimes only one company really can do the job; sometimes the contest was set up so only one could win.

    extent_competed=A · number_of_offers_received=1

    Rule single_bid_competed, methodology v1.3.0 definition and caveats

Transactions (16)

0Feb 27, 2025$68,877,000NEW BOILER PLANT AT THE VA MEDICAL CENTER, WEST LOS ANGELES, CA
P00001Feb 28, 2025OTHER ADMINISTRATIVE ACTION$0THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE CONTRACT NUMBER FROM 36C10F24C0008 TO 36C10F25C0001.
P00002Sep 18, 2025SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$24,780PERFORM ARCHAEOLOGICAL BURIED SITE TESTING (BST) AND PROVIDE A REPORT TO VA PRIOR TO MASS EXCAVATION AT THE BOILER PLANT SITE, PER PCO 001R1 (CPE-001R1)
P00003Sep 18, 2025SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$39,222ABATEMENT, REMOVAL AND DISPOSAL OF APPROXIMATELY 150 LF OF ASBESTOS CONTAINING TRANSITE PIPE.
P00004Sep 18, 2025SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$32,015INSTALL ADDITIONAL PROTECTION FOR SHORING BEAMS TO BE INSTALLED PER RFI #23
P00005Sep 18, 2025SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$36,574ABATEMENT AND REMOVAL OF ADDITIONAL TRANSITE PIPE REMOVAL OF PV DUCT BANK AND REMOVAL OF ASPHALT AND CONCRETE, AS UNCOVERED ON THE PROJECT SITE, PER PCO 0010
P00006Sep 18, 2025SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$3,074TO INSTALL A 4" 150# CHECK VALVE FOR LOW PRESSURE STEAM ON THE FLASH STEAM ECONOMIZER, PER PCO 0011
P00007Sep 18, 2025SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$1,490TO INSTALL AN ADDITIONAL HSS 4X2X1/4 POST, PER PCO 0014.
P00008Sep 18, 2025SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$37,463TO PROVIDE A VAULT THAT SOUTHERN CALIFORNIA EDISON REQUIRES UNDER THE PME GEAR PER SCE DRAWING.
P00009Jan 7, 2026SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$124,969TO PROVIDE A VAULT THAT SOUTHERN CALIFORNIA EDISON REQUIRES UNDER THE PME GEAR PER SCE DRAWING.
P00010Jan 7, 2026SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$23,803TO REMOVE A SECTION OF A WATER LINE THAT IS WITHIN THE AREA OF MASS EXCAVATION FOR THE BUILDING PAD.
P00011Apr 17, 2026SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$317,487CONTRACTOR SUBMITTED THREE TIA CAUSING 30 ADDITIONAL DAYS OF COMPENSATORY WORK.
P00012Apr 17, 2026SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$2,409PROVIDE ALL MATERIAL, LABOR, EQUIPMENT, AND SUPERVISION REQUIRED FOR THE REROUTING OF THE CONDENSATE FOR FAN COIL UNIT #1, PER PCO 0022R1 (CPE-022R1), AND RFI-0119 RESPONSE.
P00013Apr 17, 2026SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$48,035PROVIDE ALL MATERIAL, LABOR, EQUIPMENT, AND SUPERVISION REQUIRED TO ADDS AN ADDITIONAL MINI-PUMP TRAP AND ASSOCIATED PIPING TO ADDRESS THE 9FT RISE FROM THE STEAM CONDENSATE OFF THE HEAT EXCHANGERS TO THE CONDENSATE RECEIVER CONNECTION.
P00014Apr 17, 2026SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$67,982PROVIDE ALL MATERIAL, LABOR, EQUIPMENT, AND SUPERVISION REQUIRED TO INCORPORATE THE UPSIZE OF MINI POWER ZONE, ADDED BRANCH CIRCUITS, ADDED PULL BOX, AND UPSIZE OF CONDUIT METER MAIN, PER PCO 0031 (CPE-031).
P00015Jun 4, 2026SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE$0INCORPORATE CLAUSE 52.222-90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (EXECUTIVE ORDER 14398 / FAR 52.222-90 DEVIATION APR 2026) INTO THE CONTRACT.