Award
36C10F25C0001
View source record on USAspending.gov ↗NEW BOILER PLANT AT THE VA MEDICAL CENTER, WEST LOS ANGELES, CA
- Recipient
- S. J. AMOROSO CONSTRUCTION CO., LLC
- Awarding agency
- Department of Veterans Affairs
- Sub-agency
- Department of Veterans Affairs
- Fiscal year
- FY2025
- Obligated (promised)
- $69,636,302
- Total obligation (detail)
- $69,636,302
- Potential value (ceiling)
- $69,636,302
- Outlaid (paid out, linked File C)
- no linked financial data
- Signed
- Feb 27, 2025
- Period of performance
- Feb 27, 2025 – Apr 21, 2027
- Competition
- FULL AND OPEN COMPETITION
- Offers received
- 1
- Solicitation
- NEGOTIATED PROPOSAL/QUOTE
- Pricing
- FIRM FIXED PRICE
- NAICS
- 236220 — COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION
- Award type
- DEFINITIVE CONTRACT
Structural flags (1)
Competed award, single offer received
These contracts were officially open for any company to compete, but only one company showed up. Sometimes only one company really can do the job; sometimes the contest was set up so only one could win.
extent_competed=A · number_of_offers_received=1
Rule
single_bid_competed, methodology v1.3.0 — definition and caveats
Transactions (16)
| 0 | Feb 27, 2025 | — | $68,877,000 | NEW BOILER PLANT AT THE VA MEDICAL CENTER, WEST LOS ANGELES, CA |
| P00001 | Feb 28, 2025 | OTHER ADMINISTRATIVE ACTION | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE CONTRACT NUMBER FROM 36C10F24C0008 TO 36C10F25C0001. |
| P00002 | Sep 18, 2025 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $24,780 | PERFORM ARCHAEOLOGICAL BURIED SITE TESTING (BST) AND PROVIDE A REPORT TO VA PRIOR TO MASS EXCAVATION AT THE BOILER PLANT SITE, PER PCO 001R1 (CPE-001R1) |
| P00003 | Sep 18, 2025 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $39,222 | ABATEMENT, REMOVAL AND DISPOSAL OF APPROXIMATELY 150 LF OF ASBESTOS CONTAINING TRANSITE PIPE. |
| P00004 | Sep 18, 2025 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $32,015 | INSTALL ADDITIONAL PROTECTION FOR SHORING BEAMS TO BE INSTALLED PER RFI #23 |
| P00005 | Sep 18, 2025 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $36,574 | ABATEMENT AND REMOVAL OF ADDITIONAL TRANSITE PIPE REMOVAL OF PV DUCT BANK AND REMOVAL OF ASPHALT AND CONCRETE, AS UNCOVERED ON THE PROJECT SITE, PER PCO 0010 |
| P00006 | Sep 18, 2025 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $3,074 | TO INSTALL A 4" 150# CHECK VALVE FOR LOW PRESSURE STEAM ON THE FLASH STEAM ECONOMIZER, PER PCO 0011 |
| P00007 | Sep 18, 2025 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $1,490 | TO INSTALL AN ADDITIONAL HSS 4X2X1/4 POST, PER PCO 0014. |
| P00008 | Sep 18, 2025 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $37,463 | TO PROVIDE A VAULT THAT SOUTHERN CALIFORNIA EDISON REQUIRES UNDER THE PME GEAR PER SCE DRAWING. |
| P00009 | Jan 7, 2026 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $124,969 | TO PROVIDE A VAULT THAT SOUTHERN CALIFORNIA EDISON REQUIRES UNDER THE PME GEAR PER SCE DRAWING. |
| P00010 | Jan 7, 2026 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $23,803 | TO REMOVE A SECTION OF A WATER LINE THAT IS WITHIN THE AREA OF MASS EXCAVATION FOR THE BUILDING PAD. |
| P00011 | Apr 17, 2026 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $317,487 | CONTRACTOR SUBMITTED THREE TIA CAUSING 30 ADDITIONAL DAYS OF COMPENSATORY WORK. |
| P00012 | Apr 17, 2026 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $2,409 | PROVIDE ALL MATERIAL, LABOR, EQUIPMENT, AND SUPERVISION REQUIRED FOR THE REROUTING OF THE CONDENSATE FOR FAN COIL UNIT #1, PER PCO 0022R1 (CPE-022R1), AND RFI-0119 RESPONSE. |
| P00013 | Apr 17, 2026 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $48,035 | PROVIDE ALL MATERIAL, LABOR, EQUIPMENT, AND SUPERVISION REQUIRED TO ADDS AN ADDITIONAL MINI-PUMP TRAP AND ASSOCIATED PIPING TO ADDRESS THE 9FT RISE FROM THE STEAM CONDENSATE OFF THE HEAT EXCHANGERS TO THE CONDENSATE RECEIVER CONNECTION. |
| P00014 | Apr 17, 2026 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $67,982 | PROVIDE ALL MATERIAL, LABOR, EQUIPMENT, AND SUPERVISION REQUIRED TO INCORPORATE THE UPSIZE OF MINI POWER ZONE, ADDED BRANCH CIRCUITS, ADDED PULL BOX, AND UPSIZE OF CONDUIT METER MAIN, PER PCO 0031 (CPE-031). |
| P00015 | Jun 4, 2026 | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | $0 | INCORPORATE CLAUSE 52.222-90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (EXECUTIVE ORDER 14398 / FAR 52.222-90 DEVIATION APR 2026) INTO THE CONTRACT. |